Repairs on the southeast bank of Ivy Lake begin on September 25, 2018 and are expected to be complete early October.

These repairs result in the closure of a portion of the trail to ensure pedestrians are kept safe and there is adequate space for construction materials and equipment.

The City reminds the public to remain cautious when moving past a construction area and to obey all signage.

Ivy Lake Slope Repair

Information provided by the City of Grande Prairie.