The City of Grande Prairie’s 2022 Intersection Improvements Program began today along 92 Street near the Signature Falls and Riverstone South neighbourhoods.

The program includes traffic signal repair and replacement, durable pavement marking, and geometric upgrades to ensure intersections remain safe and meet the needs of our growing community.

These programs can include everything from new and rehabilitated traffic signals and crosswalks to geometric upgrades on roadways to enhance the flow of traffic through intersections.

On 92 Street, the scope of construction includes:

    • Adding a right turn lane for northbound traffic on 92 Street at 72 Avenue
    • Adding a left turn lane for southbound traffic on 92 Street at 72 Avenue
    • Adding a left turn lane for southbound traffic on 92 Street at 80 Avenue

Traffic will be maintained throughout construction. Drivers are reminded to watch for workers in all construction areas and to pay attention to all posted signage.

Transit stop 247 will be closed for the duration of construction. Transit passengers are asked to please reroute to a newly added temporary stop located on 92 Street south of 72 Avenue.

The trail located on the east side of 92 Street (south of 72 Avenue) will be closed during construction.

For more information on construction, visit cityofgp.com/construction2022 or contact the City by phone at 311 or e-mail at info@cityofgp.com.

Information provided by the City of Grande Prairie